Pörner Gruppe Logo

Purified Water Plant

Optimizing / modernizing of an existing purified water production plant

  • Location: Kundl / Austria

  • Scope of services:

    • Tendering

    • Detail Engineering

    • Site supervision

    • Commissionnig

    • Plant validation acc. to GMP and FDA standards

  • Time: 2006 - 2007

Ventilation Plants

Installation/revamp of ventilation units within new resp. existing production halls, control rooms and laboratories under different demands (natural ventilation, noise reduction, cross contamination, air condition, minimized shut downs...)

  • Loction: Kundl / Austria
  • Scope of services:

    • Quantity/temperature/pressure measurements on the existing units
    • Detail Engineering
    • Tendering
    • Site supervision
    • Start-up assistance
    • Documentation

  • Time: continuous since 1999 

Mini-fermentation Plants

Extension of the laboratory experimental plant by 10 new mini-fermentation units and a new sterilizer (autoclave)

  • Location: Kundl / Austria
  • Scope of services:

    • As-built investigation

    • Detail Engineering

    • Cost estimation

    • Tendering

    • Site supervision

    • Commissioning

    • Documentation

  • Time: 2008 - 2009

Fungiculture Plant

Implementation of a fungiculture plant with an unique cultivation process in bottles

  • Client: Edlinger
  • Location: Marchfeld (near Vienna) / Austria
  • Scope of services:

    • Tendering
    • Detail Engineering
    • Site supervision
    • Start-up
    • Documentation

  • Time: 2005 - 2006

Polymeric Fibre Pilot Plant

Installation of a pilot plant for polymeric fibre production

  • Client: Fraunhofer Institut für Silikatforschung
  • Location: Würzburg / Germany
  • Scope of services:

    • Project management
    • Detail Engineering
    • Layout planning
    • Procurement
    • Construction management
    • Acceptance tests/Tests

  • Commissioning: 2005

Pilot Plants

Installation of pilot plants and laboratories for training purposes

  • Client: OMV
  • Location: Gänserndorf; Gerasdorf / Austria
  • Scope of work:

    • Project management
    • Basic engineering
    • Detailed engineering
    • Tendering
    • Site supervision for process training plants and laboratories

  • Time: 2002 - 2004

Aseptic Sample String

Installation of an aseptic sample laboratory for parenteral cephalosporin agents, consisting of H2O2 decontamination chamber, aseptic glove isolator cell, personnel air lock and sterile room conditioning

  • Location: Kundl / Austria
  • Scope of services:

    • Tendering
    • Detail Engineering
    • Site supervision
    • Commissioning
    • Plant validation acc. to GMP and FDA standards

  • Time: 2002 - 2003

Protein Pilot Plant

Extension of a protein pilot plant incl. related laboratory rooms for the production of GMP conform clinic samples and production of pharmaceutical proteins

  • Location: Kundl / Austria
  • Scope of services:

    • Plant concept
    • Cost estimation
    • Detail Engineering
    • Layout planning
    • Tendering
    • Site supervision for plant components
    • Specification of operating principles
    • Plant validation acc. to GMP and FDA standards

  • Time: 2001

Capture Chromatography Plant

Capture chromatography plant for purification fo protein solvents with acid chromatography

  • Location: Kundl / Austria
  • Scope of services:

    • Plant concept
    • Cost estimation
    • Detail engineering
    • Tendering 
    • Site supervision for the plant components acc. to GMP and FDA standards

  • Time: 2001

Training Center

Installation of a training center for trainees in biochemical processing industry, with laboratories and apparatus incl. all necessary fluid systems (steam, N2, vacuum, compressed air, process water, waste water, chilled water, hot oil)

  • Location: Kundl / Ausrtia
  • Scope of services:

    • Project study 
    • Investment cost estimation
    • Detail engineering
    • Procurement assistance
    • Site supervision
    • Start-up for laboratories, apparatus and piping systems

  • Time: 1999 - 2000

Micro Filtration Plant

Micro filtration plant for cell harvest of E-coli and yeast fermentation respectively cell cultures for concentration and dia filtration of extracts

  • Location: Kundl / Austria
  • Scope of services:

    • Plant design
    • Cost estimation
    • Detail Enginering
    • Tendering
    • Site supervision for the plant components
    • Specification of operating principles
    • Plant validation acc. to GMP and FDA standards

  • Time: 1999 - 2000

Biochemical Laboratory Complex

Installation of a complete biochemical laboratory for the Biochemical Institute Shemjakin

  • Client: OWEG
  • Location: Moscow / Russia
  • Scope of work:

    • Basic engineering
    • Detail engineering for civil and laboratory facilities
    • Site supervision

  • Time: 1987- 1989