Evaluation of approx. 70 tanks including infrastructure (pumps, pipelines, foundations, etc.) at the Petrobrazi refinery. Evaluation with 3D laser scans. Shutdown, revitalization or new construction according to economical, safety-related and environmental criteria. Construction of a new 10,000 m3 storage tank for heavy reformate with an aluminum dome.
Retrofitting of the existing HDS1 high-pressure desulphurization plant; replacing old with new reactor, heat exchangers and connecting pipelines
Modification of the existing Arosolvan plant: replace-ment of N-methyl-2-pyrrolidone (NMP) by the less toxic solvent tetraethylene glycol (TTEG), minimization of energy and utilities consumption
Revamp of CDU with replacement of two side strippers, pre-column and liquid gas column with two reboilers during shutdown "Step2" in 2019.
Extension of the existing measuring, dosing and blending systems to improve plant flexibility and to double capacity.
Conversion of the propane deasphalting plant (PDA plant) engineered and installed by EDL in 2011 incl. use of solvent mixture instead of propane
Design and delivery of a lube oil blending and grease plant including storage tanks and ancillary facilities with an optimized pigging system for lubricant mixing, filling, storage and shipping of base oils and additives just in time.
Modernization of a Vapor Recovery Unit (VRU) by an upstream arranged Carbon Retrofit Unit (CRU) to increase the re-liquefied amount of hydrocarbons by the fuel loading of trucks, vessels and ships.
Modernization of the FCC Unit by several individual projects like, optimization of the main column condensation, replacement of the main valves, dismantling of the old and installation of a new modified heat recovery boiler. Finalization during TAR 2017.
Replacement of the HDS3 reactor in the plant for desulphurisation and denitrification of vacuum gasoil; the technical configuration of the reactor: 465°C and 80bar, 25m high and 382t
Yield improvement and enhanced plant operation mode, replacement of column bases, pipes and miscellanous MSR-equipment
Yield improvement and enhanced plant operation mode, replacement of column and key equipment
Revamp of the crude oil distillation unit (Rohöl1) with replacement of the vacuum column and a stripper column, mounted by modules; finalized at the shut-down "kleiner 16"; the vacuum column is 71 m high and one the the biggest refinery buildings
Replacement of the regenerator in the FCC unit; because of the heavy weight (648 t) it was performed in three cases and was finalized together with the LCO recovery project during shut-down "kleiner 16"
EPCM-Contractor for modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
EPCM-Contractor for capacity extensions to Butadiene production unit
EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant
Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site
Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL
FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality
New refinery gas plant Modification of associated existing units
Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one